Adapting existing CHW and LTHW systems.
MPH modified the existing chilled water (CHW) and low-temperature hot water (LTHW) distribution pipework to provide connections serving eight fan coil units within the refurbished Level 9 East office area.
Working with established building systems meant assessing practical connection locations, service clearances and routes to the revised terminal equipment positions without unnecessary disturbance to the wider network.