AMWINS 22 Bishopsgate

22 Bishopsgate (L9)
Project overview / 01

Existing systems. A carefully adapted workspace.

22 Bishopsgate is a prominent City of London commercial tower. The AMWINS Level 9 East refurbishment required existing building services to be adapted for a revised office layout, including new fan coil connections and a relocated tea point.

Working under Mala Engineering, with Overbury as Principal Contractor, MPH delivered targeted chilled and low-temperature hot water alterations, new condensate connections and public health pipework, including a practical solution to restricted drainage-stack access.

Location
22 Bishopsgate, London
Sector
Commercial refurbishment
Status
Completed
Principal Contractor
Overbury
MEP Contractor
Mala Engineering
MPH role
Mechanical & Public Health Adaptations
Installation summary

Project at a glance

08
FCUs connected to adapted services
02
Existing CHW / LTHW systems
01
Relocated tea point served
Pumped
Waste discharge to high-level pipework

CHW & LTHW modifications • FCU condensate drainage • BCWS to relocated tea point • Jung Pumpen pumped discharge

The engineering / 02

Targeted alterations. Practical engineering.

01 / Heating & Cooling

Adapting existing CHW and LTHW systems.

MPH modified the existing chilled water (CHW) and low-temperature hot water (LTHW) distribution pipework to provide connections serving eight fan coil units within the refurbished Level 9 East office area.

Working with established building systems meant assessing practical connection locations, service clearances and routes to the revised terminal equipment positions without unnecessary disturbance to the wider network.

02 / Condensate

New FCU condensate connections.

The mechanical alterations also introduced condensate pipework serving the fan coil units. MPH routed the new drainage to an available connection on the existing building drainage stack.

The installation required coordination between terminal equipment locations, the available pipework routes and the infrastructure already in place in the ceiling and service zones.

03 / Domestic Water

Serving a relocated tea point.

The new tea point required a fresh boosted cold water supply (BCWS) connection. MPH adapted the existing service within the tenant riser, extending pipework to the tea point’s revised position.

The connection was integrated with surrounding services and the office fit-out, enabling the new amenity to be served from the building’s established boosted cold water network.

04 / Drainage Solution

Resolving a restricted high-level waste connection.

A direct new connection to the vertical drainage stack was not accessible at the required location. MPH instead developed a workable installation route using an existing high-level waste pipe.

A Jung Pumpen pumped wastewater arrangement enabled discharge from the relocated tea point to that elevated pipework connection, resolving the access constraint while retaining the required tea point position.

MPH’s contribution / 03

Our scope of works.

  • Existing chilled water (CHW) distribution adaptations
  • Existing low-temperature hot water (LTHW) adaptations
  • Heating and cooling pipework connections serving 8 FCUs
  • New FCU condensate drainage pipework
  • Condensate connection to existing drainage stack
  • BCWS adaptations within the tenant riser
  • New cold water pipework to relocated tea point
  • Jung Pumpen pumped wastewater discharge
  • Adaptation to existing high-level waste pipework
  • Coordination with existing mechanical and public health services