A pumped drainage strategy for restricted floor voids.
The new workplace required above-ground foul drainage serving tea points, staff pantries, the prayer room, cleaners' facilities and associated equipment. The available floor void and the position of existing connections made conventional gravity drainage difficult to accommodate.
The Stage 3 engineering strategy therefore called for wastewater to be pumped to a high-level route, before falling by gravity to the existing stacks within the WC cores. MPH's drainage package required careful coordination of pump locations, routes and connections with the surrounding building services.