Connecting the core water infrastructure.
A central element of MPH’s package was the installation and connection of GRP water storage and variable-speed booster equipment. The mTT strategy placed the principal potable storage and boosting infrastructure at basement level, with distribution rising through the service cores to meet building demand.
MPH coordinated tank, pump and distribution connections within the plantroom, considering isolation, access, valve locations and interfaces with the rising mains. This work formed the starting point for the domestic cold water system serving the refurbished office floors and welfare areas.