Working with what the building already had.
Grosvenor House was already an established student residence. The refurbishment therefore depended on making new installations work alongside selected retained services rather than treating the property as a blank new-build structure.
Existing incoming water infrastructure, distribution pipework and drainage stacks were identified for reuse where suitable. MPH installed new branches and adaptations to suit the accommodation layouts, coordinating connections with the available risers, service voids and plantroom arrangements.
