Mechanical drain-down and strip-out within retained services.
MPH undertook the mechanical drain-down and strip-out elements of its package to prepare existing installation areas for the revised office arrangement. These enabling works preceded the modifications to the heating and cooling connections.
Working with retained building infrastructure required careful coordination of access, the boundaries of the alterations and the interface between services being removed, adapted and retained.