Project overview / 01

New workplace needs. Established building infrastructure.

60 London Wall is a prominent commercial building in the City of London. The Invesco third-floor refurbishment reconfigured existing Category A accommodation for a new Category B office layout, while retaining and adapting the building services infrastructure.

Working under Mala Engineering, with Parkeray as Principal Contractor, Modern Plumbing & Heating (MPH) carried out mechanical drain-down and strip-out, adapted the existing four-pipe fan coil unit connections, added and rerouted condensate pipework, and delivered domestic hot and cold water services for the revised workspace.

Location
Level 03, 60 London Wall, City of London
Sector
Commercial CAT B refurbishment
Principal Contractor
Parkeray
MEP Contractor
Mala Engineering
Client
Invesco
MPH role
FCU, Condensate & Domestic Water Adaptations
Installation summary

Project at a glance

04-PIPE
Existing FCU system adapted
CHW / LTHW
Heating & cooling connections
CONDENSATE
New pipework & rerouting
H + C
Domestic water services
The engineering / 02

Precise adaptations. Seamless integration.

01 / Enabling Works

Mechanical drain-down and strip-out within retained services.

MPH undertook the mechanical drain-down and strip-out elements of its package to prepare existing installation areas for the revised office arrangement. These enabling works preceded the modifications to the heating and cooling connections.

Working with retained building infrastructure required careful coordination of access, the boundaries of the alterations and the interface between services being removed, adapted and retained.

02 / Four-Pipe Fcus

Reconfiguring chilled and heating water connections.

The third-floor FCUs operate on a four-pipe arrangement, with separate chilled water (CHW) and low-temperature hot water (LTHW) flow and return circuits. The new Category B layout required the existing terminal connections to be adapted to revised equipment positions.

MPH modified the FCU pipework, coordinating changes at sub-branches and final connections with the retained distribution, existing service routes and surrounding ceiling installations.

03 / Condensate

Adding and rerouting FCU condensate pipework.

Revised fan coil locations also required condensate services to be added and existing routes altered. MPH installed additional condensate pipework and rerouted sections to suit the changed FCU arrangement.

The connections needed to be integrated with retained discharge routes and competing ceiling services, with attention to practical pipework routing, access and the wider refurbishment sequence.

04 / Cold Water

Extending domestic cold water services.

The public health package included domestic cold water pipework and connections for the reconfigured third-floor accommodation, including tea points, kitchenettes and other staff facilities. These services were integrated with the building’s existing boosted cold water supply.

New distribution routes had to be coordinated with partitions, ceiling spaces and the fit-out, with suitable service isolation and access considered at the connection points.

05 / Hot Water

Domestic hot water for the updated workspace.

MPH also undertook the domestic hot water pipework and connection works associated with the new office facilities. The project specification set out hot water provision for general outlets and a separate first-aid-room arrangement.

The installed pipework interfaces were coordinated with the cold water services and surrounding furniture and fit-out requirements, allowing the refurbished spaces to be served from the revised domestic water network.

06 / Coordination

Integrating new services within the existing building.

The works brought together enabling strip-out, four-pipe FCU adaptations, condensate modifications and domestic water distribution within a retained base-build environment. Existing riser locations and adjacent services influenced installation sequencing and pipework routes.

By focusing on targeted alterations and carefully coordinated connections, MPH supported the third-floor refurbishment without requiring wholesale replacement of the building’s wider mechanical distribution.

MPH’s contribution / 03

Our scope of works.

  • Mechanical drain-down and strip-out works
  • Adaptations to the existing four-pipe FCU network
  • Chilled water (CHW) sub-branch and final connections
  • Low-temperature hot water (LTHW) branch alterations
  • FCU pipework connections to suit the revised layout
  • Additional FCU condensate pipework
  • Rerouting of existing condensate pipework
  • Domestic cold water distribution and connections
  • Domestic hot water pipework and service connections
  • Water services for tea points and staff facilities
  • Coordination of isolation and maintenance access
  • Interfaces with retained services and office fit-out works