← All projects
Commercial / Legal CAT B Office Fit-OutCompleted

Reed Smith Blossom Yard

Reed Smith – Blossom Yard
Project overview / 01

A new home for a global law firm.

Reed Smith's relocation to 1 Blossom Yard brought a global law firm's London workplace into a distinctive setting that combines contemporary architecture with the character of an original timber warehouse. Overbury's Category B fit-out connected spaces for collaboration, client meetings and everyday work across the headquarters.

Working under Mala Engineering, with Overbury as Principal Contractor, Modern Plumbing & Heating (MPH) undertook a defined mechanical and public health pipework package. Its Level 8 works ran from the base-build service interfaces to the fan coil units, while its public health and domestic water package extended from Levels 1 to 8.

The project called for accurate integration of new tenant services with the base-build infrastructure, coordinating service routes and equipment connections within a high-quality commercial fit-out.

Location
1 Blossom Yard Spitalfields, London E1 6RS
Sector
Commercial / Legal CAT B Office Fit-Out
Status
Completed
Principal Contractor
Overbury
MEP Contractor
Mala Engineering
Client
Reed Smith
MPH role
L8 FCU Mechanical Pipework L1–L8 Public Health & Domestic Water
Installation summary

Project at a glance

08
Floors of MPH public health & domestic water works
L08
Mechanical pipework from base build to FCUs
CAT B
Commercial office fit-out
114k
Sq ft of fit-out across the wider project*

*Overall project figure reported by Overbury; it is not a measurement of MPH's subcontract area.  •  Reed Smith headquarters at 1 Blossom Yard, London.

The engineering / 02

Interfaces matter. So does the installation.

01 / Mechanical Services

From the base build to the Level 8 FCUs.

On Level 8, MPH installed mechanical pipework between the base-build connection points and the fan coil units serving the new fit-out. This work formed the critical link between the landlord's existing services and the terminal equipment serving the office accommodation.

The installation was carried out in accordance with the project connection requirements, with attention to practical pipework routes, the arrangement of terminal connections and the surrounding ceiling service zones.

02 / Terminal Connections

Coordinating the final distribution routes.

The Level 8 installation required the new pipework to be accommodated around the fan coil locations and other fit-out services. Routing the distribution within the available ceiling spaces called for attention to installation tolerances, adjacent services and access to the FCUs.

The TB+A contractor-design schedule identified support details, pipework component selection and final access provisions as project-wide coordination matters. MPH's role was the installation of its allocated pipework package under the wider MEP delivery arrangements.

03 / Public Health

Domestic water services across eight floors.

MPH's public health and domestic water works extended across Levels 1 to 8, providing pipework services for the revised office accommodation and supporting facilities.

The multi-floor package required distribution and connections to be integrated with the floor layouts and available building-service interfaces. As the fit-out progressed, service routes needed to remain coordinated with partitions, ceilings and the wider building-services installation.

04 / Occupant Facilities

Serving the amenities within a modern workplace.

The wider workplace design included breakout hubs, tea-point areas, meeting facilities and shared spaces. Public health pipework and domestic water services formed part of the essential infrastructure supporting those facilities.

MPH's installation activities sat at the interface between the building's main services and the fit-out requirements, supporting the coordinated delivery of water and related public health connections in the allocated areas.

05 / Base-Build Interfaces

New systems within an established infrastructure.

In a Category B fit-out, base-build interfaces can influence the routing, sequence and practicality of the services that follow. At Blossom Yard, those interfaces were particularly relevant to the Level 8 FCU connections and the distribution of public health services through the building.

The engineering documentation placed importance on hangers and brackets, pipework arrangements, condensation/condensate coordination at project level and defined access locations. These were wider project requirements informing the installation environment; they are not all claimed as separate MPH work packages.

06 / Project Delivery

Contributing to a coordinated multi-floor fit-out.

Overbury delivered the wider headquarters fit-out through a carefully phased programme spanning two interconnected buildings. For MPH, the defined Level 8 mechanical work and Level 1–8 public health installations formed an important part of the wider sequence of building-services activity.

The project illustrates the breadth of MPH's commercial fit-out capability: delivering specialist terminal pipework on one level while undertaking public health and domestic water services across multiple floors.

MPH’s contribution / 03

Our scope of works.

  • Level 8 mechanical pipework from base-build interfaces
  • Level 8 fan coil unit pipework connections
  • Mechanical pipework routing within coordinated fit-out zones
  • Interface coordination with existing building services
  • Public health installations across Levels 1–8
  • Domestic water distribution across Levels 1–8
  • Floor-level domestic water supply connections
  • Public health pipework to designated fit-out areas
  • Connections associated with workplace wet areas
  • Coordination with the wider MEP installation
  • Pipework supports and installation access considerations
  • Multi-level pipework delivery under Mala Engineering
Work with MPH

Let’s deliver your next project.

Get In Touch

Modern plumbing & heating