From the base build to the Level 8 FCUs.
On Level 8, MPH installed mechanical pipework between the base-build connection points and the fan coil units serving the new fit-out. This work formed the critical link between the landlord's existing services and the terminal equipment serving the office accommodation.
The installation was carried out in accordance with the project connection requirements, with attention to practical pipework routes, the arrangement of terminal connections and the surrounding ceiling service zones.